CONSTRUCTION
MANAGEMENT, LLC
WE DO IT ALL.
WE DO IT RIGHT!
7 3 2 - 9 2 9 - 7 4 0 0
FULL-SERVICE GENERAL CONTRACTOR
At JB Construction Management LLC, we take pride in bringing elegance to your home through our renovation projects. Our team is skilled at installing prefinished hardwood flooring, ceramic tile, luxury vinyl planks as well as marble and granite. Let us help you design and create borders that will give your home an elegant and beautiful look.
WE DO IT ALL.
WE DO IT RIGHT!
WE DO IT ALL. WE DO IT RIGHT!
JB Construction Management of New Jersey, with a generalized overview of how we might install new ceramic tile flooring:
-
Preparation:
-
Measure the area where the tile flooring will be installed and calculate the amount of tile needed, factoring in extra for cuts and waste.
-
Select the type, size, and pattern of tiles according to the client's preferences and the project requirements.
-
Gather all necessary tools and materials, including tiles, tile adhesive, grout, spacers, tile cutter or wet saw, trowel, level, and sponge.
-
Ensure that the subfloor is clean, level, dry, and structurally sound. Any necessary repairs should be completed before proceeding.
-
-
Layout and Planning:
-
Determine the starting point for laying the tiles, considering factors such as the room's dimensions and layout.
-
Use chalk lines or tile layout grids to plan the placement of the tiles, ensuring they are aligned properly and laid out in a visually pleasing manner.
-
-
-
Applying Adhesive:
-
Mix the tile adhesive according to the manufacturer's instructions until it reaches a smooth consistency.
-
Use a notched trowel to spread the adhesive onto the subfloor, working in small sections at a time.
-
Create ridges in the adhesive with the notched side of the trowel to ensure proper adhesion of the tiles.
-
-
Laying Tiles:
-
Begin laying tiles at the predetermined starting point, pressing them firmly into the adhesive.
-
Use tile spacers to maintain consistent spacing between tiles and ensure uniform grout lines.
-
Continue laying tiles in rows, working outward and across the floor, and periodically checking for levelness.
-
Use a tile cutter or wet saw to make any necessary cuts to fit tiles around obstacles or along edges.
-
-
Grouting:
-
Allow the tile adhesive to set for the time specified by the manufacturer before grouting.
-
Mix the grout according to the manufacturer's instructions until it reaches a smooth consistency.
-
Use a grout float to apply grout to the tile joints, working it into the gaps between tiles at a 45-degree angle.
-
Remove excess grout from the tile surface with a damp sponge, rinsing frequently to prevent grout haze.
-
-
Cleaning and Sealing:
-
After the grout has cured for the recommended time, clean the tiles and grout lines with a grout haze remover if necessary.
-
Apply a penetrating grout sealer to protect the grout from stains and moisture, following the manufacturer's instructions.
-
-
Final Touches:
-
Remove any remaining tile spacers and clean the tiles thoroughly to remove any adhesive residue or grout haze.
-
Inspect the finished tile floor for any imperfections or areas that may require touch-ups.
-
Throughout the installation process, JB Construction Management would ensure attention to detail, proper technique, and adherence to industry standards to achieve a high-quality result. Always consult with them for specific guidance tailored to your project.